top of page

Tapa

Single Egg Package

Duration: 4 weeks
Project Type: Industrial Design
Date: September 2022

This egg package was a short class project. In 4 weeks, I ideated based on the average egg size and supportive structures. One idea was selected and tested with drop test.

bottom of page